Number |
Methodologies |
Notes |
EN-S-001 |
Introduction of high efficiency boilers |
Only for new construction projects in the household sector *1 |
EN-S-006 |
Introduction of high efficiency lighting facilities |
Only for projects that install new bulb-type LED lamps in the household sector *1 |
EN-S-007 |
Introduction of co-generation equipment |
Only in the household sector *1 |
EN-S-012 |
Introduction of electric vehicles / plug-in hybrid vehicles |
Only in the household sector (including leasing contracts) *1 |
EN-S-016 |
Introduction of high efficiency refrigeration equipment |
Only in the household sector *1 |
EN-S-024 |
Update of TV sets |
Only projects in the household sector that apply the Top Runner standard as the baseline equipment efficiency *1 |
EN-S-039 |
Construction/ Renovation of/ to energy-saving houses |
Only for new constriction of energy-saving houses |
EN-S-044 |
Introduction of hydrogen fuel cell vehicles |
Only in the household sector (including leasing contracts) *1 |
EN-R-002 |
Introduction of solar power generation |
Only in the household sector and in the case of additional capital investment in installed photovoltaic installations *1 *2 |
EN-R-011 |
Introduction of hydrogen fuel cell vehicles(using hydrogen not derived from renewable energy) |
Using hydrogen not derived from renewable energy) (Only in the household sector (including leasing contracts) *1 |
IN-002 |
Introduction of recovery and degradation system of N2O used for anesthesia |
- |
AG-001 |
Abatement of N2O emissions from pig and broiler excreta disposal by utilizing low-protein feed |
- |
AG-004 |
Biochar addition to mineral soil in cropland/ grassland |
- |
AG-005 |
|
- |
FO-001 |
Forest management activity |
Only if no final cutting is planned in the project site or if reforestation is planned in all project sites where final cutting is planned |
FO-002 |
Afforestation activity |
- |
FO-003 |
Reforestation Activity |
- |